Friday, November 30, 2007
November 30, 2007
Things are looking up at the house. The granite countertop has been installed and our cabinets are currently being installed. There is some finish work left on them. The rock on the outside of the house is completed. It looks very nice. They have also poured a concrete pad on the north side of the house where there have been some drainage problems in the past. We are so glad to get that concrete in as that side of the house was a real eyesore. The tile is completed in the shower and tub area as well as the floor in the master bathroom. We have selected carpeting and window coverings which should be installed in the next two to four weeks. :-)